Please see the
attached pics on one of our
Roadhog Maintenence Projects. Pic #42, you see the juncture at the
lower end of the ditch---this will all be concreted together when
finished. Pic 43 shows the mat being placed between the larger rock
in the bottom of the ditch and the smaller rock in the top of the
ditch. Pic #45 is an overview---the gravel toward the lot will be
leveled. The area on the other side of the ditch going up the hill
will be sodded. Pic # 47 shows the downside at the very end of the
culvert where the water will run out. Pic #50 shows one of seven or
eight bent or leaning light poles that will be straightened. We
encourage everyone to drive carefully in the park.
We are making a lot of progress---work has not yet started on
repairing the damaged sections of roadway,
but the project will proceed once the rain ends. |
|
|
|
Several trees were
damaged due to the ice storm this year and had to be removed. We
hope to implement an ongoing project for tree replacement. |
|
|
|
This information
will be placed in the August Newsletter.
We have some members who do not view the message board.
|
|
|
|
|
|
|
|
.jpg) |
.jpg) |
.jpg) |
.jpg) |
.jpg) |
|
Pic # 42 |
Pic # 43 |
Pic # 45 |
Pic # 47 |
Pic # 50 |
|
|
|
 |
|
|
|
Anyone wanting to
have pictures posted,
send them to
rob@rtwhitewebs.com |